OH 7:
 

Summary:

OH 7 will be an Super-2 expressway from Chesapeake to Rome. The segment from US 52 to OH 775 is complete. Another segment, east to the junction with existing OH 7 near Fairland East Elementary School, is under construction. The final segment to the east is on hold indefinitely as of January 17, 2004. Local officials are appealing the state’s decision not to fund the expressway. There is a 2.39-mile long Super-2 expressway just south of Athalia. The OH 7 bypass of Pomeroy starts as a Super-2 at OH 124 and soon becomes 4 lanes. There is a project currently under construction to connect the east end of the Pomeroy Bypass with the Appalachian Highway (OH 32 / US 50) in Coolville. The OH 7 expressway starts up again 1.5 miles south of OH 32 and OH 7 is multiplexed with the Appalachian Highway from there to Belpre. It continues as an expressway to Marietta. A Marietta Bypass is planned. For most of the Marietta to Powhatan Point segment, there is no expressway, with 3 exceptions: Willow Island Lock and Dam, Hannibal, and Clarington. North of that, there are at-grades on four sections of the OH 7 freeway: from 3 miles north of Powhatan Point to 3 miles north of Dilles Bottom, from Bridgeport to 2 miles north of Martins Ferry, in Steubenville, between Stratton and just north of OH 213, and in East Liverpool. The final expressway segment of OH 7 is from the south corporate limits of Conneaut (1.68 miles south of I-90) to 1.84 miles north of I-90. This 3.52-mile long highway provides access to Conneaut. For the southernmost 1.23 miles, the highway is a Super-2, and the rest of the expressway is 4-lane divided.

History:

Date Activity
1946 2 miles west of Belpre to Belpre complete
1953 Plans were begun to build a Chesapeake Bypass, 49 years before construction began.
1962 Belpre to Marietta
1963 Coolville to Little Hocking
1966 Porterfield to 2 miles west of Belpre
Late 1960's The segment just south of Athalia was constructed as a Super-2 on a 4-lane ROW
1969 Pomeroy Bypass constructed as a Super-2 from west end to US 33
1970 Empire to Wellsville, Bridgeport to Martins Ferry
1972 3 miles north of Powhatan Point to 3 miles north of Dilles Bottom
1976 Part of the Pomeroy Bypass twinned
1978 Martins Ferry to 2 miles north of Martins Ferry, Willow Island Lock and Dam segment
1994 Construction began on eastern part of Pomeroy Bypass
1996 Eastern part of Pomeroy Bypass complete
2002 Construction of the segment between OH 243 and OH 775 near Chesapeke started as a super-2. This segment is now complete.
Summer 2003 Construction started on the segment from OH 775 to existing OH 7 near Fairland East Elementary School.
November 2004 Completion scheduled for the segment from OH 775 to existing OH 7 near Fairland East Elementary School.
January 2005 ODOT put Phase II of the Chesapeake Bypass back on the Tier II TRAC list. It had been removed from the funding list in January 2004.

 

Junction Log:

Junction Type of Access
US 52 interchange
CR 1041 at-grade
CR 287 at-grade
Roslyn Dr / Tallow Ridge Rd at-grade
OH 527 interchange
Chesapeake to south of Athalia no expressway
Township Rd 1285 (Molter) at-grade
Township Rd 1147 (Jewell) at-grade
No expressway from Athalia to Pomeroy Bypass
Hobson Dr (CR 21), Shady Cove Rd, Leading Creek Rd, Bone Hollow Rd, McGuire Rd, the west end of the OH 124 multiplex, Union Ave, OH 143, Collins Rd, Howell Hill Rd, Hiland Rd, Laurel Cliff Rd, Naylors Run Rd, and Laurel Cliff Rd at-grades
US 33 / OH 833 Diamond interchange. The thru route is US 33 east to OH 833 south and OH 833 north to US 33 west.
CR 20, CR 25, CR 20A, Twp 673, CR 25, and Old Route 7 at-grades
US 33 / CR 7A interchange
No expressway from the Pomeroy Bypass to 1.5 miles south of US 50
Old State Rd at-grade
Skeels Rd at-grade
US 50 / OH 32 trumpet with OH 7 as the thru route
Mountain Bell Rd, OH  144, CR 68, CR 58, CR 63, Township Rd 28, Township Rd 29, 8CR 26, Walker Rd, OH 124, OH 555, and Township Rd 608 at-grades
OH 618 y-interchange
OH 339, Township Rd 97, Richmiller Ave, and Braum Rd at-grades
US 50 / OH 32 / OH 618 interchange
Lockhart St, Township Rd 51, CR 3, Township Rd 7, CR 10, Township Rd 125, Township Rd 279, and Bramblewood Heights Rd at-grades
OH 550 interchange
No expressway from Marrietta to Willow Island Lock &  Dam
CR 87 at-grade
No expressway from Willow Island Lock & Dam to Hannibal
Risi Ln, OH 536 east, Township Rd 428, and OH 536 west at-grades
No expressway from Hannibal to Clarington
Skyes Ridge Rd, Hope Alley, OH 78, Cherry Alley, Ferry St, Market St / Apple Alley, and OH  556 at-grades
No expressway from Clarington to 3 miles north of Powhatan Point
Old OH 7 / Township Rd 298, Township Rd 501, Chestnut Grove Rd, and Township Rd 533 at-grades
Freeway from 3 miles north of Dilles Bottom to I-470
I-470 At-grade at an access road which leads to a trumpet interchange
Kilgore Rd at-grade
I-70 Click here to see diagram (from the Ohio SLD).
Lincoln Ave at-grade
Aetna St signal
OH 647 signal
Zane Highway, Mackay Ave, Ohio Ave, Don St, Glenns Run Rd, and Old OH 7 at-grades
Freeway from 2 miles north of Martins Ferry to Steubenville
3rd St at-grade
South St, OH 43 / Washington St, Logan St, Franklin Ave, and University Ave. traffic lights
US 22 Click here to see diagram (from the Ohio SLD).
Freeway from US 22 to Stratton
3rd St, 2nd St, CR 7C, Goose Run Rd, OH 213, and CR 7C at-grades
Shadyside Ave, Edwards St, Etna St, Divison St, OH 267, and the US 30 ramps. at-grades
From US 30 to the southern corporate limits of Conneaut, there are freeway and non-limited access segments of OH 7
Center Rd, South Ridge Rd, and Underridge Rd at-grades
I-90 diamond with I-90 as the thru route
Gateway Ave, Welton Rd, Mill Rd, Liberty St, and Main St at-grades

 

Sources:
Pete Jenior, Sherman Cahal, Dave Norris, H.B. Elkins, John Simpson, James C. Schul, Dan Ficker, Brian Powell, Ohio DOT, aaroadtrips.com, Sean Lyons, Marc Fannin, Sandor GulyasDisclaimer

Last Updated: 1/20/04